Facts and Figures

- USD 400m was spent on the stadium construction and the park landscaping.
- Major construction was accomplished within less than 36 months.
- Over 160,000 m3 of concrete was cast into the building frame.
- 12,295 tons of rebar was used for manufacturing the structure frame.
- 3,471 prefab ferroconcrete components were manufactured and assembled during construction.
- 458,761 m3 of soil was excavated to make the foundation pit.
- 3,248 piles support the stadium's foundation.
- The total weight of the roofing metalwork (inclusive of 3,800 tons of steel) is over 6,000 tons.
- The total weight of the stadium's handrails and fencing is 55 tons.
- The total area of the breeze-block dividing walls is 61,171 sq.m.
- 10 tons of paper used for the stadium drawings during the construction period.
- About 20,000 certificates for inside works signed (certified).
- The construction site area is 234,376 sq.m (inclusive of the mobilization areas).
- Over 1,680 people worked at the construction site at busiest times (mostly Turkish citizens and Ukrainians).
- About 1,200 km of cabling was laid for various systems.
- The total area of the stadium's glazed facade is 24,000 sq.m.
- The underground height of the building: parking lot - 12m; dressing rooms - 8m, media space rooms - 4m.
- Height from pitch level to the topmost roof point is 54m.
- The total floor area of all the stadium's levels makes 83,823 sq.m.
- 93% of stands are roof-covered, only 3,800 seats in the bottom tier are not covered.
- 51,504 is the total seating capacity of the stadium.
- 1,159 seats for the media (424 for print media, 432 for non-print media, 168 seats for observers; 45 commentary positions, each having 3 seats).
- 196 seats for the people with disabilities and their carers (104 and 92 respectively).
- 830 seats in the 45 executive boxes of the stadium.
- 24 first-aid stations (18 permanent ones and 6 mobile ambulance groups).
- Over 1,000 parking places (245 of which are underground).
- 53 fast-food outlets, a fan cafe, 4 "Silver" bars, 3 restaurants ("Diamond", "Platinum", "Gold" ones), a media cafe and a lounge bar will accommodate any visitor's taste.
- 25 ha is the total area covered by the park and the stadium.
- 13 ha is the total area of the green lawns in the park.
- 77,000 plants in the park (281 trees and about 35,000 rose bushes).
- 40.5 tons is the total weight of the fountain ball which is located at the south entrance (the ball alone weighs 28 tons (made of a single piece of granite) and the stand weighs another 12,5 tons).
- 228 m3 of water circulates within the fountain cascades facing Chelyuskintsev St.
- 15,000 m3 is the water volume in the south pond.
- The stadium's logo structure weighs 50 tons, it is 8m high and 14m wide.
- The pitch size is 105m х 68m.
- The ground surface includes: natural grass - 7,992 sq.m., artificial turf - 1,877 sq.m.
- 810 rolls of natural grass (each 10m long) were brought from Slovakia by 27 trucks.
- 26 automatic sprinklers water the pitch.
- 2,000 lux is the lighting intensity, ensured by 272 high-precision targeting spotlights mounted along the perimeter of the stadium's roof.
- 6,000 ports installed in the stadium for concurrent network connection.
- The stadium's video monitoring system comprises 448 CCTV cameras.
- 588 monitors installed throughout the stadium.
- 92 sq.m is the display surface of each of the 2 giant LED screens.
- 267m is the total length of the LED electronic advertising hoardings.
- It takes the spectators about an hour to occupy all their seats in the stands.
- It takes the visitors 8 minutes to evacuate.